Dishwasher Duct Installation - Embassy Suites Aruba Hotel

Dishwasher Duct Installation - Embassy Suites Aruba Hotel

Category: HVAC / Commercial Ventilation · Mexico City · 2025
BIM Design Manufacturing International Project
Efficient Manufacturing
International Logistics
TDF Sectional Installation

Project Summary

A duct system was designed and installed for the kitchen and dishwasher area of the Embassy Suites Aruba Hotel, meeting international standards and applying BIM modeling for manufacturing precision. The project involved international logistics coordination and on-site technical supervision to ensure a functional, safe ventilation system delivered within the committed deadlines.

Objectives
  • Manufacture galvanized sheet TDF ducts complying with international standards.
  • Coordinate maritime transport and logistics to the island of Aruba.
  • Supervise the final installation with trained local personnel.
Solution
  • BIM duct modeling to optimize time and minimize on-site errors.
  • Prefabrication in Mexico with quality control prior to international shipment.
  • Remote and on-site technical coordination to ensure accurate and delay-free installation.
Impact
  • Reduced total execution time through BIM planning and synchronized logistics.
  • Greater product quality control by centralizing manufacturing in Mexico.
  • Optimization of operating costs by eliminating rework and on-site contingencies.

Gallery

Embassy -  1
Embassy -  2
Embassy -  3

Technical Sheet

Scope Design, prefabrication, shipping, and complete installation of the duct system for the kitchen and dishwasher area.
Material Galvanized TDF sheet metal with airtight sealing and reinforced joints.
Timeframe 14 weeks of execution (planned and completed).

Results

96%
Estimated Internal Improvement Rate

Project executed with precision, on-time completion, and high customer satisfaction.

"

They optimized manufacturing times and costs without sacrificing quality.

— General Manager, Embassy Suites Aruba Hotel

Similar project? We integrate BIM design, manufacturing, and installation

Start your quote now

Related Projects

Store Remodeling – Antara Mall CDMX
Store Remodeling – Antara Mall CDMX

Installation of ventilation and exhaust ducts in a commercial remodeling project. Night work with on-time completion.

Learn more
Maintenance and Duct Fabrication
Maintenance and Duct Fabrication

Fabrication and installation of ventilation and A/C systems. Ongoing projects with guaranteed quality.

Learn more
Turks and Caicos Project – Hotel Sandals
Turks and Caicos Project – Hotel Sandals

International ventilation and A/C project at Hotel Sandals with global standards.

Learn more

Or sign in with:

Contact us
Please login first

Or sign in with: