Turks and Caicos – Hotel Sandals

Turks and Caicos – Hotel Sandals

Category: HVAC / International Projects · Energy Management Group (EMG) · 2025
International Project Duct Fabrication Hotel Sandals
International fabrication
Logistics coordination
Precise installation

Project Summary

Ducts for air conditioning, exhaust, and ventilation systems were manufactured for the new Hotel Sandals in Turks and Caicos. Based on the original plans, design improvements were proposed through BIM modeling to optimize airflow and increase energy efficiency. The work included international logistics coordination and direct installation supervision to ensure quality and compliance with international hotel standards.

Objectives
  • Manufacture ducts in galvanized, black, and stainless steel sheet according to project requirements.
  • Coordinate maritime transport and shipment to the island of Turks and Caicos.
  • Supervise on-site installation to ensure technical compliance and deadlines are met.
Solution
  • Review and improvement of plans to optimize routes and system efficiency.
  • Prefabrication in Mexico with quality control and secure packaging for export.
  • Coordination with the international site to ensure efficient assembly and regulatory compliance.
Impact
  • Optimization of internal air routes and improved equipment performance.
  • On-time completion of international deadlines with maritime transport and technical supervision.
  • Increased assembly efficiency thanks to BIM modeling and modular prefabrication.

Gallery

Turks & Caicos -  1
Turks & Caicos -  2
Turks & Caicos -  3

Technical Sheet

Scope Design, prefabrication, export, and installation of ventilation, exhaust, and air conditioning systems for an international hotel.
Material Galvanized, black, and stainless steel sheet.
Time 4 and a half months.

Results

+19%
Overall process improvement

+20% in international logistics efficiency · +18% in design and prefabrication optimization · 97/100 in internal rating.

BIM modeling and international logistics coordination ensured an efficient assembly and compliance with hotel industry standards.

— Featured quote (internal)

Similar project? We integrate BIM design, fabrication, and installation

Start your quote now

Related Projects

Store Remodeling – Antara Mall CDMX
Store Remodeling – Antara Mall CDMX

Installation of ventilation and exhaust ducts in a commercial remodeling project. Night work with on-time completion.

Learn more
Maintenance and Duct Fabrication
Maintenance and Duct Fabrication

Fabrication and installation of ventilation and A/C systems. Ongoing projects with guaranteed quality.

Learn more
Dishwasher Duct Installation – Hotel Embassy Suites Aruba
Dishwasher Duct Installation – Hotel Embassy Suites Aruba

We designed and manufactured the kitchen and dishwasher duct system for the Hotel Embassy Suites Aruba, featuring BIM modeling, prefabrication in Mexico, and international logistics.

Learn more

Or sign in with:

Contact us
Please login first

Or sign in with: