Store Renovation at Mall Antara CDMX

Store Renovation at Mall Antara CDMX

Category: HVAC / Commercial Ventilation · Mexico City · 2025
Duct installation Night work Guaranteed deadline
Professional installation
Certified team
On-time delivery

Project Summary

The ventilation and exhaust ducts were designed and manufactured for the renovation of a store at Mall Antara CDMX. The project involved night work, coordination with other disciplines, and strict compliance with standards to ensure proper equipment performance in an environment with limited space between ceiling and roof.

Objectives
  • Install ventilation ducts made of galvanized sheet metal with zeta lock joints.
  • Install kitchen exhaust ducts made of black iron sheet (welded type).
  • Meet execution deadlines without affecting other site installations.
Solution
  • Needs assessment and technical design using specialized software.
  • Workshop prefabrication and controlled transport of materials to the site.
  • Planned night installation to avoid interference with mall activities.
Impact
  • Reduced total execution time by 15%.
  • Elimination of interferences with other disciplines through coordinated planning.
  • Higher client satisfaction due to on-time delivery and installation quality.

Gallery

Antara 1
Antara 2
Antara 3

Technical Data

Scope Design, manufacturing, and installation of ventilation and exhaust ducts in a commercial area.
Material Galvanized sheet with zeta lock joint and weldable black iron sheet.
Time 15 days → 13 days (15% reduction).

Results

+15%
Overall Process Improvement

+12% operational efficiency · +18% time utilization · 94/100 internal performance rating.

Nighttime planning and cross-discipline coordination made it possible to deliver ahead of schedule without affecting other installations.

— Highlighted internal quote

Similar project? We integrate BIM design, manufacturing, and installation

Start your quote now

Related Projects

Dishwasher Duct Installation – Hotel Embassy Suites Aruba
Dishwasher Duct Installation – Hotel Embassy Suites Aruba

We designed and manufactured the kitchen and dishwasher duct system for the Hotel Embassy Suites Aruba, featuring BIM modeling, prefabrication in Mexico, and international logistics.

Learn more
Maintenance and Duct Fabrication – Continuous Projects GG123
Maintenance and Duct Fabrication

Fabrication, installation, and continuous maintenance of ventilation and A/C systems.

Learn more
International Project Turks and Caicos – Hotel Sandals
International Project Turks and Caicos – Hotel Sandals

International HVAC project: industrial duct manufacturing and installation.

Learn more

Or sign in with:

Contact us
Please login first

Or sign in with: