Installation of ventilation and exhaust ducts in a commercial remodeling project. Night work with on-time completion.
Learn more
Dishwasher Duct Installation - Embassy Suites Aruba Hotel
Project Summary
A duct system was designed and installed for the kitchen and dishwasher area of the Embassy Suites Aruba Hotel, meeting international standards and applying BIM modeling for manufacturing precision. The project involved international logistics coordination and on-site technical supervision to ensure a functional, safe ventilation system delivered within the committed deadlines.
- Manufacture galvanized sheet TDF ducts complying with international standards.
- Coordinate maritime transport and logistics to the island of Aruba.
- Supervise the final installation with trained local personnel.
- BIM duct modeling to optimize time and minimize on-site errors.
- Prefabrication in Mexico with quality control prior to international shipment.
- Remote and on-site technical coordination to ensure accurate and delay-free installation.
- Reduced total execution time through BIM planning and synchronized logistics.
- Greater product quality control by centralizing manufacturing in Mexico.
- Optimization of operating costs by eliminating rework and on-site contingencies.
Gallery
Technical Sheet
| Scope | Design, prefabrication, shipping, and complete installation of the duct system for the kitchen and dishwasher area. |
| Material | Galvanized TDF sheet metal with airtight sealing and reinforced joints. |
| Timeframe | 14 weeks of execution (planned and completed). |
Results
Project executed with precision, on-time completion, and high customer satisfaction.
They optimized manufacturing times and costs without sacrificing quality.






